Asbestos Refurbishment & Demolition Survey
A Refurbishment & Demolition Survey is needed before any refurbishment or demolition work is carried out. This type of survey is used to locate and describe, as far as reasonably practicable, all Asbestos Containing Materials (ACM) in the area where the refurbishment work will take place, or in the whole building if demolition is planned.
The survey will be fully intrusive and involve destructive inspection, as necessary, to gain access to all areas, including those that may be difficult to reach. A Refurbishment & Demolition Survey may also be required in other circumstances, for example when more intrusive maintenance and repair work will be carried out or for plant removal or dismantling.
We are also able to offer an ongoing service of regular re-inspections to assist our clients with their ongoing asbestos management.
Frequently Asked Questions
We’ve answered the common questions we get asked about this service
If you have any further questions then please contact us today.
We will provide
An Asbestos Refurbishment & Demolition Survey

A PDF and Web report with recommendations
Free Access to BLOCK7

Fire Safety Management Software to assist in ongoing risk management
One Hour’s Free Consultancy

Support for each and every risk assessment
Our Process
Assess
To assist in your understanding of health and safety requirements, we will identify hazards on site and, for each one, we will determine how well we believe you are currently complying with health and safety standards through observation, evaluation of documentation and discussion.
Validate
For quality assurance, RM has a two stage validation process for each and every audit that is published. First the report is verified by the assessor that carried out the assessment, and secondly the respective Department Head reviews and validates the report before publishing to the client.
Report
To help you to actively manage your risks, RM publishes all of its assessment reports to BLOCK7 where, amongst other things, you will be able to view and download static and dynamic PDF reports. In addition, you can view and search risks according to the categorisation of Intolerable, Substantial and Moderate, or Monitor & Review with Traffic Light methodology.

